Kontakt mit Lieferant? Lieferant
Richard SHEN Mr. Richard SHEN
Was kann ich für Sie tun?
Chat Jetzt Kontakten mit Lieferant
 Telefonnummer:86-574-88255925 E-Mail-Adresse:sales@steel-tubes.com
Home > Produkt-Liste > DOM Stahlrohre > TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
  • TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
  • TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
  • TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
  • TORICH BS6323-6 Cold Finished ERW DOM Steel Tube

TORICH BS6323-6 Cold Finished ERW DOM Steel Tube

    Einheitspreis: USD 600 / Ton
    Zahlungsart: L/C,T/T,D/P,Paypal,Money Gram,Western Union
    Incoterm: FOB,CFR,CIF,FCA,CPT
    Minimum der Bestellmenge: 5 Ton
    Lieferzeit: 30 Tage

Basisinformation

Modell: BS6323-6

Techniken: Kalt gezeichnet

Legierung: Nichtlegierung

Surface: Oiled

Shape: Round

Standard: BS, BS6323-6

Keyword: DOM STEEL TUBE

OD: 6-350mm

WT: 1-35mm

Length: Max 12000mm

Grade: CEW1a CEW2a CEW3a CEW4a CEW5a

Application: Auto Industry

Additional Info

Verpakung: DOM Steel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.

Produktivität: 20000 tons/year

Marke: TORICH

Transport: Ocean,Land,Air

Ort Von Zukunft: China (Zhejiang)

Versorgungsmaterial-Fähigkeit: 5000Tons per Year

Zertifikate : ISO9001,ISO14001,TS16949

Hafen: Shanghai,Ningbo

Produktbeschreibung

TORICH BS6323-6 Cold Finished Electric Resistance Welded DOM Steel Tube

Product Description:

Standard: BS6323-6

Size Range: OD: 6-350mm
WT: 1-35mm

Length: max 12000mm

Steel Grade: CEW1a CEW2a CEW3a CEW4a CEW5a

Delivery Condition:

1 BK Cold finished(hard)

2 BKW Cold finished(soft)

3 GBK Annealed

4 NBK Normalized

5 GZF Annealed (including de-scaling)

6 NZF Normalized (including de-scaling)


Product Pictures:

IMG_0532PIC_20161202_150109_47C

Packing:

Steel Tube Container PackingPacking In Hexagon Bundle

Characteristic:

Good concentricity

Good OD and ID tolerance

High precision

Stable quality

Smooth roughness

DOM Steel Tube Production Process:

Raw material → Incoming inspection → Cutting → Heating → Piercing → Hammering →Pickling → Cold-drawing → Heat treatment → Physical chemistry test → Straightening → Ends cutting → Final inspection → Bundling →Storage


Torich's Chemical assurance
1.Each lot of raw materials will be tested by spectrometer before put in storage.
2.100%PMI the mother pipe to ensure we put right material.
2.100%PMI the finished pipe again to ensure we produced right grade

Heat Treatment Assurance

A full-automatic natural gas furnace with 24 meters in length.The real temperature tolerance could be within 10℃.



FAQ

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us

TORICH BS6323-6 Cold Finished Electric Resistance Welded DOM Steel Tube



Produktgruppe : DOM Stahlrohre

Mail an Lieferanten
  • Mr. Richard SHEN
  • Ihre Nachrichten muss zwischen 20-8000 Zeichen sein

Liste verwandter Produkte

Zuhause

Phone

Skype

Anfrage